Warmly congratulate the successful operation of the second phase of the fully automatic production line for the RSIN Group in Nigeria

Due to force majeure reasons such as COVID-19, our fully automated plating line to RSIN Group in Nigeria was delayed to be installed and put into operation.

 

Warmly congratulate the successful operation of the second phase of the fully automatic production line for the RSIN Group in Nigeria

 

At the beginning of April 2023, our engineers flew to Nigeria non-stop, with a stopover in Lagos Airport.

 

Warmly congratulate the successful operation of the second phase of the fully automatic production line for the RSIN Group in Nigeria

 

After arrived at the RSIN Group factory, our engineers did not have time to rest and started to install and commission the equipment immediately.

 

Warmly congratulate the successful operation of the second phase of the fully automatic production line for the RSIN Group in Nigeria

 

After just 15 days of installation and commissioning, the first batch of qualified products were successfully manufactured by the fully automated production line provided by Ruisite.

 

Warmly congratulate the successful operation of the second phase of the fully automatic production line for the RSIN Group in Nigeria

 

Large quantities of qualified products were continuously produced under the guidance of Ruisite's chemical engineers

 

Warmly congratulate the successful operation of the second phase of the fully automatic production line for the RSIN Group in Nigeria

 

In middle of May, 2023, after the successful completion of the installation and commissioning training, We delivered this fully automated production line successfully. Before departing for home, everyone took a photo to remember.